Back to jobs
ScovaiScovaiJobs
GI

Group IPS

Project Manager – Data Center Construction

Nivelles, BEOn-siteContractPart-time

Posted Sep 28, 2026

Group-IPS. Come join us in reshaping the future of Engineering and Architecture Projects.

Who are we? IPS is an international company with inhouse Engineering and specialized services across Project Management for industries, Automation and Architecture. EPCM expertise, more than 10 countries around the globe but an entrepreneurial and teambuilding mindset.
Now, We are looking for a Data Center Project Manager, based in Belgium.

What is the role About?

You will contribute to data center development projects across all stages of their lifecycle, gradually taking on greater responsibility and ownership.

• Feasibility: Coordinate the assessment of building and white-space layouts, technical requirements, preliminary schedules, procurement strategies, budgets and Tier objectives.
• Project preparation: Manage investment analysis, basic engineering, Tier requirements, permitting and procurement planning.
• Project delivery: Oversee detailed engineering, construction and commissioning, ensuring that all teams remain aligned on scope, schedule, budget and project requirements through to handover.



Requirements

  • A master’s degree in electrical, mechanical, electromechanical, HVAC or civil and structural engineering, or a related field.
  • Nice to have: PMP certification or another recognized project management qualification, or a relevant data center certification.
  • You have approximately 3–4 years of professional experience, including relevant exposure to data center or other technically complex / mission-critical projects.
  • You understand the main stages of data center development and delivery, from feasibility and design through procurement, construction, commissioning and handover.
  • Experience working in BIM-based multidisciplinary project environments and using BIM as a coordination and project-management tool.
  • Nice to have: Familiarity with data center testing, commissioning, integrated systems testing and handover processes. Experience as a Commissioning Manager is not required.
  • You can lead multidisciplinary projects, coordinate technical teams and manage stakeholders.
  • Very good knowledge of French/Dutch and English.
  • Ability to work independently, as well as strong team and communication skills.
  • Driver's license B
  • Open to national and international mobility



Benefits

  • Permanent contract
  •  Safety, Prevention and Well-being are basics for us.
  • Specialized in-house trainings designed to help you to get your next career step.
  • Truly a place to spread your wings: career path.
  • No glass ceiling! We are committed to equal opportunities.
  • Top clients and innovative projects.
  • International environment and teams, with a presence in more than 10 countries.
  • Great environment! with Open Office Layout for you to meet  co-workers and  increase the outside-the-box thinking.
  • Positive Work Vibes: we love work, sport and fun.
Being an IPSer:


Excellence, Innovation, Sustainability are a must in our projects. Equality, Diversity, Team Spirit, Positive Work Environment, and Career Development are the must for our people and part of our DNA.
All qualified applicants will receive consideration for employment without regard to race, religion, colour, age, sex, national origin, sexual orientation, gender identity, disability, or status.


Role snapshot

Job type

Part-time

Required skills

Data Center Development Lifecycle KnowledgeFeasibility Studies and Site AssessmentBudget and Investment AnalysisProcurement Planning and StrategyConstruction and Commissioning OversightCommissioning and Integrated Systems TestingBIM Coordination and Multidisciplinary BIM UseStakeholder ManagementTeam Leadership (leading multidisciplinary teams)Technical Engineering Coordination (electrical/mechanical/HVAC/civil)Permitting and Regulatory Compliance ManagementMultilingual Communication (French, Dutch and English)Project Management Methodologies / PMP familiarity

Similar jobs

Next-Link

Global Predictive Maintenance Expert

Next-Link

Nivelles, BEOn-siteContractFull-time
11 days ago
GI

Mid Level Package Owner

Group IPS

Nivelles, BEOn-sitePermanentFull-time
5 days ago
HRhelpdesk

Recruitment Leader (Talent Scout)

HRhelpdesk

Gurgaon, INOn-siteContractPart-time
9 hours ago
Extra Multi-Ressources

Adjoint(e) administrative

Extra Multi-Ressources

Québec, CAOn-siteContractPart-time
9 hours ago
OI

Freelance Third-Party Inspector (Mechanical) - Bedford, Ohio, USA

Orbit International Survey Services LLC

Bedford, USOn-siteContractPart-time
14 hours ago
OI

Freelance Third-Party Inspector (Mechanical) - Lansing, Michigan, USA

Orbit International Survey Services LLC

Lansing, USOn-siteContractPart-time
14 hours ago