FR
Fadac Resources
Principal Engineer MEP Automation
Victoria Island, NGSur siteCDITemps plein
Publié 23 oct. 2026
Cet emploi est publié en EN
JOB PURPOSE
A senior technical leader responsible for the strategic design, integration, and performance of utility systems (power, compressed air, water) across industrial, logistics, and agro-processing parks. This role bridges automation, mechatronics, and infrastructure engineering to ensure operational excellence and scalability. Direct multi-disciplinary engineering teams through design, construction, and commissioning of utility systems supporting industrial operations.
Core Responsibilities and Key Result Areas
Strategic Leadership
- Define and lead engineering strategy for utility systems and automation across all industrial parks• Develop 5-year utility infrastructure roadmaps aligned with business expansion plans
- Drive innovation in automation, energy efficiency, and technology adoption across utility systems
- Present capital investment proposals and ROI analyses to executive leadership
- Conduct feasibility studies for new facilities: site evaluation, utility availability, capital requirements
Technical Oversight
- Design electrical distribution systems: MV/LV switchgear, transformers, motor control centers, backup power, arc flash studies
- Engineer compressed air systems: compressor sizing, distribution networks, quality standards (ISO 8573), leak detection.
- Develop industrial water systems: process water, cooling towers, steam generation/distribution, condensate recovery, wastewater pre-treatment
- Integrate mechatronic systems: PLC/SCADA platforms, automated controls, energy management systems
- Approve technical specifications, drawings, and vendor solutions for utility infrastructure
Project & Portfolio Management
- Manage utility infrastructure projects >$2M through design, procurement, construction, and commissioning
- Lead multi-disciplinary teams (10-25 engineers/technicians) across mechanical, electrical, and automation disciplines
- Collaborate with PMs to align utility engineering with project timelines and budgets
- Review and approve engineering deliverables for EPC contracts
- Manage risk, compliance, and performance metrics across utility systems
Stakeholder Engagement
- Interface with OEMs, contractors, and internal teams to ensure alignment and quality
- Negotiate utility service agreements and manage vendor relationships
- Coordinate with operations, maintenance, and production teams for system optimization
- Provide executive-level reporting on utility system performance and strategic initiatives
- Establish engineering standards and design guidelines for consistent multi-site implementation.
Key Performance Indicators
- Project Delivery Timeliness: Percentage of projects completed on schedule.
- Budget Adherence: Projects delivered within approved financial limits.
- Quality of Deliverables: Conformance to agreed standards and client expectations.
- Stakeholder Satisfaction: Positive feedback from internal and external stakeholders.
- Risk Management Effectiveness: Reduction of project delays and cost overruns due to risks.
- Team Productivity: Efficient coordination and performance of project teams.
Job Specifications
Qualifications and ExperienceEducational Requirements
- Bachelor’s degree/HND in Project Management, Engineering, Business Administration, or a related field.
- Master’s degree is an added advantage
Professional Requirements
- Professional certification (e.g., PMP, PRINCE2, CAPM, or equivalent) is an advantage.
Experience Requirements
- 10+ years industrial utility systems engineering
- 5+ years leading engineering teams and major capital projects.
Competency Requirements
Knowledge Requirements
- Power Systems: Load flow analysis, arc flash studies, protective coordination, power quality, generator sizing, emergency power systems
- Process Utilities: Compressed air quality and efficiency, steam system design and optimization, industrial water
treatment, cooling tower design
- Mechatronics: PLC programming and system architecture, HMI/SCADA development, VFD applications, sensor integration, predictive maintenance systems
- Engineering Tools: AutoCAD Electrical/Plant 3D, ETAP/SKM PowerTools, Primavera P6/MS Project
Skill Requirement
- Proven track record commisioning utility systems for facilities
- Direct experience with PLC/SCADA implementation and mechatronic system integration
- Multi-site project management experience
- Preferred: International projects in emerging markets
Personal Abilities
- Ability to work with little or no supervision.
- Confidentiality and integrity
- Attention to details
- Emotional intelligence
- Conflict Resolution
- Time management
Requirements
Aperçu du poste
Type de poste
Temps plein
Compétences requises
Utility Systems Engineering StrategyElectrical Power Systems Design and AnalysisCompressed Air System EngineeringIndustrial Water, Steam, and Cooling Systems EngineeringPLC Programming and SCADA DevelopmentMechatronic Systems IntegrationUtility Systems CommissioningCapital Project ManagementMulti-Disciplinary Engineering Team LeadershipMulti-Site Project ManagementEngineering Tools: AutoCAD Electrical, Plant 3D, ETAP, or SKM PowerToolsProject Scheduling with Primavera P6 or MS ProjectTechnical Specification and EPC Deliverable ReviewVendor and Utility Service Agreement NegotiationUtility Project Risk and Compliance Management
Emplois similaires
Payroll Supervisor
CIG Motors
Victoria Island, NGSur siteCDITemps plein
il y a 28 jours
Software Developer
Liburdi
Hamilton, CASur siteCDITemps plein
il y a 3 heures
TS
Materials Control Clerk
TKO StaffPros
Saltillo, USSur siteCDITemps plein
il y a 3 heures
Chargé.e principal.e des communications et du rayonnement institutionnel
Cameleon RH
Montreal East, CASur siteCDITemps plein
il y a 3 heures
Chargé.e de la planification et des partenariats médias payants
Cameleon RH
Montreal East, CASur siteCDITemps plein
il y a 3 heures
TS
Information Technologist - Lee County, MS
TKO StaffPros
Tupelo, USSur siteCDITemps plein
il y a 3 heures